Florence Ave Bridge Over San Gabriel River
Downey, CA

  • SIZE: Three-span CIP/PS Concretesf
  • COST: $12,000,000

Schwab Engineering has provided assistance to The City of Downey in advanced
planning and preparation of Highway Bridge Program (HBP) Funding
assistance and estimates for the replacement of the existing channel
crossing. Schwab Engineering performed field investigation and condition assessment of the existing bridge and provided justification for the replacements
including significant deck deterioration and seismic deficiencies and scours issues. The existing bridge carries 4 lanes of traffic. It is a 304-ft long cast-in-place concrete structure supported in 4 concrete piers walls built in 1951. The proposed bridge will consists of two parallel CIP-PS structures having 300-ft long, supported on two concrete pier
walls.