Westbound & Eastbound Connector Bridges Calif Dept of Transp Gorman, CA
Gorman, CA

  • COST: $3,500,000

Schwab Engineering provided Engineering design services for the seismic retrofit
of the Westbound and Eastbound Connector Bridges at the I-5 and
I-138 Interchange in Gorman, California. The work also included
performed seismic analysis and pushover analysis for substructure,
seismic evaluation and retrofit strategy report. For the final submittal,
we produced the retrofit design and plans, quantity and cost estimates,
and bridge specifications (PS&E).